 So, hey guys! How are you? You might have read my previous blogs about panel casting and panel placing. Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part. 

You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing. 



Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks more water, and complete the dewatering of excavation pit in less time.  



When does this happen ?

This happens mostly in Summer season's or Monsoon season, when rainfall gives heavily/ day-by-day. In that time doing excavation is not of any use. It will lead to muddy like condition or like as damp soil. Generally do this excavation work when the soil is dry or unsaturated. Basically this should be done in spring season or winter season. Because, you all know why? At that time less rainfall occurs, or the soil is partially saturated. 

Now, the main thing is what to do after excavation? Yeah, I am asking you only. What to do after this step? 
Don't panic 😃. There is nothing step to worry about. There is a thing called Geotextile / Geobag (whatever you say). You have to laid it on the excavation pit so that it maintains barrier between silty clay and GSB. Wait I will show you in the photo. 
This is the type of Geotextile, you have to fix it on the excavation pit.


So after fixing this Geotextile on the excavation pit you have to give GSB layer. So that it hardens the surface and gives a nice compaction to maintain proper erection and hardens the ground. And after that the levelling pad work is started. 

Erection of panels mainly depends upon the excavation. Yes, one more thing to tell you, make the Levelling Pad properly. 
Take the level by Auto-level machine and see that there is no up & down 1mm also. Otherwise the whole panel erection will fail to rise. So give the level properly, so that you can make the levelling pad in nice and proper order. 




And after making all these erection of panel starts. And what to do for erection, all these I will explain in another blog. 

Comments

Popular posts from this blog

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

How to make Staircase in Etabs

 In the last blog I had described about making beams, columns, slabs/roofs in Etabs. But I forgot to tell you how to make staircase. Apology for that. But today in this blog I am going to discuss how to make staircase in Etabs. So before making Staircase first of all delete one side of the slab by single click. But remember one thing in the story side you should have to click "All Stories" so that automatically all slabs will get deleted and required gap and positioning will be appeared.  First click on All Stories After that select one portion of slab   After that go to Edit menu and click on Delete   Then one part of the slab of each story becomes hollow So doing the following steps you can now make the staircase. As for staircase we need hollow section at the top of it, so that it's free to move. In practical field also you can't provide staircase if the roof is covered with slab. Now the main procedure begins for Etabs.  Go to define tab menu and click on Se...

WHAT IS PEDESTAL IN FOOTING ?

 During foundation you should always be careful that there is no water present in the excavation pit and the depth should be accurate. So for that you need manwork and labourers to maintain it's accuracy. So before going further for any work just be careful that the depth of foundation is accurate and no error should be made. Because the structure of a building is fully depend upon foundation. And this is general sense that the all the building loads are carried to the foundation i.e., footing.  Before doing any foundation work first of all brick soiling is to be done or sand filling. The building where high rise structures are made, sand filling is done; but the house with ground floor, brick soiling is sufficient. But from where you will get the bricks. Obviously you will have to order or bring it from bricks factory where bricks are made. And after bringing the bricks where you will placed them?  (Actually all these practical knowledge are not taught in the college so ...