Skip to main content

How to make 3D Render in Etabs

 Ok, so in the last two blogs I had described about how to make beams, columns, slabs and staircase in Etabs. But as a beginner for somebody it's easy whereas for someone it's rough to understand or have misconception. If you have not understood or read it then go to the above links and practice it again. And if you have understood then it's good and go forward for the upcoming steps. Because the more you learn, the more you understand. The more you get knowledge, the more you learn new things. So if you want to render like as if I had rendered it then you are on the right website. Just follow the instructions as I have told you. 

This is the Rendering view, which I have Rendered. You can also see the 3D View also.

After making the complete building structure and modelling all those beams, columns, slabs, staircase etc. you come to the ribbon wizard which is above plan view or 3-D view. You can see a Tick-mark ☑ option which is also known as "Set Display Option". You can also press on keyboard Ctrl+W. 


After clicking or pressing that option a new dialog box appears. In their three tab appears, "General", "Object Assignments", "Other Assignments". You click on the General tab. After that in the Special Effects box you check the "Extrude Frames", "Extrude Shells" options. "Object Fill" & "Object Edge" options are check from first only. You no need to worry about these. That means it remains as default. After checking those Extrude Frames and Extrude Shells come to the below and you see that Apply to All Windows check box appears. Just check out that. After that click on Apply button. You can see the 3D-Struture in your display. After that click on OK button. 


So now you can see your Plan view as well as the 3D-View windows also. It looks like as you have modelled the structure and ready to show to your client. But not like that. Well it's different thing I will explain this in the next blog. But see the 3D Structure. It looks like as you have rendered it. It looks amazing, isn't it? 


But you now have noticed one thing. In the previous blogs I have told you to make staircase and I had made it also, but what's this. In here no staircase is available 😍😍😂😂. Ok, that's a different structure I have modelled and this is different. But you should not do like this, until you know anything about Etabs. After knowing a little bit about it you can make different structures and model it. But as a beginner you should have to practice it or exercise it 😄. Means exercise you brain and practice it as I have given the instructions.

And if you have not seen my previous blogs then, you can click here.

Ok bye, bye see you in the next blog. You can follow me on 
Facebook:-  Construction329
Instagram:-  https://www.instagram.com/abhijit.patowary.33/

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient for the work. 

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks mo

Machineries used in RE Wall

 So far you all have known that, how RE Wall construction is done and how they are installed. You might have known from the previous blogs. The panels, how are they casted and how the erection work is done. If you have not seen my previous blogs then you will understand nothing. First go and understand these articles by clicking on the link and then only you will understand here briefly.  So, the type of machineries used in RE Walls are as follows :-  Hydra  Dumper  Grader  Roller  Falkland  JCB  Vibrator  HYDRA  Hydra is the most important machinery used in RE Wall. Without hydra, nothing work is possible to do. Because to lift the panels, you will need crane or hydra. After casting for demolding the panels, you will need hydra only and also for panel erection, hydra is only the main aim to lift the panels. So HYDRA is the heart of RE Wall. Without this machine you will have to wait for somedays for work.  DUMPER  Dumper is used for transportation, to bring the soil. aggregates etc. f