MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval. 

 


All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation. 

For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient for the work. 

Concrete Mixer

For any kind of road project the most commonly used machines are rollers, grader, bull dozers, and many more. These are some machines that are used for road construction work. All such machines make the work more efficient and easy to work. These are some of the criteria that are need to be kept in mind for the easy task of work. 

But now the world has change. All works now a days are done by machines. In cities where big big projects are being taken, all are done by machines. In those projects machine work is more as compare to hand-made work. As a result less labour is needed and all works are done easily with less time. This makes the work smart and easy handling, but use and utilise the brain more.

Now a days, there are some unimaginable things which are done by machines. Even the grass cutting and trees cutting work are done by machines. Load lifting, bar cutting, wood cutting, dewatering etc. all things are done by machines. All these machinery items are expensive but does the work in less time and less labour is required. For every single machine only one operator is needed to do the work. 

Hydraulic Crane

Grinder machine

Wood Cutter machine


Comments

Popular posts from this blog

Machineries used in RE Wall

 So far you all have known that, how RE Wall construction is done and how they are installed. You might have known from the previous blogs. The panels, how are they casted and how the erection work is done. If you have not seen my previous blogs then you will understand nothing. First go and understand these articles by clicking on the link and then only you will understand here briefly.  So, the type of machineries used in RE Walls are as follows :-  Hydra  Dumper  Grader  Roller  Falkland  JCB  Vibrator  HYDRA  Hydra is the most important machinery used in RE Wall. Without hydra, nothing work is possible to do. Because to lift the panels, you will need crane or hydra. After casting for demolding the panels, you will need hydra only and also for panel erection, hydra is only the main aim to lift the panels. So HYDRA is the heart of RE Wall. Without this machine you will have to wait for somedays for work.  DUMPER  Dumper is used for transportation, to bring the soil. aggregates etc. f

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks mo