Skip to main content

CONCRETE

As a Civil Engineer we all know that concrete is the most important subject to make any structure. Because without concrete nothing can be made. For providing steel structures, first of all it should be fitted with concrete at the foundation level. For making any infrastructure, concrete is used. Bridges, tunnel, highway columns, underwater structures in all and everything concrete is the self made item for all. So the use of concrete and knowledge of it is very important as a Civil Engineer.

Concrete Tests:-  
So what are basic tests made for concrete. Well its very simple, as you had learned in your college life. Then also let me discuss with you once for a revision. The most common two important test are Slump Cone Test & Cubic Test. Yes, you have read it right. In every practical field these two test are done. Slump test is done to know its workability while cube test is done to identify the compressive strength. Other tests are also done such as Compaction Factor Test, Vee-Bee test etc. 

There are also Non-Destructive test that are done for concrete to check its durability. They are Rebound Hammer Test, Ultrasonic Pulse Velocity Test, Magnetic Reasoning Test, Electrical method test etc. All these digital equipment test is very interesting and it looks like as if you are different from others and gives the real feel of Civil Engineer. 

Mixing of Concrete:-
As we all know that concrete is made by mixing three ingredients i.e., water, cement & aggregates (fine & coarse). It is mixed by three ways, that are: a) hand mix which is done for domestic works or house works, b) Concrete Mixer mix which is done for industrial works or company works, c) RMC batch plant mix which is done for high structure works or bridge works. In most cases concrete mixer mix is used which takes less time to give proper mix and it can be done at low cost also. That means it gives benefit in both ways i.e., less time and low cost. To learn more about this you can click here.

Concrete Transportation:-
Transportation of concrete is done only one way i.e., through Transit Mixer. The Transit Mixer takes the concrete from RMC Batch Plant and after that it come to the site to use it. First of all the workability of concrete is checked with slump cone apparatus and after that the concrete is casted with the help of concrete pump. For better knowledge you can watch this video. 

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks...