Zoo-tiniali Flyover work

The erection of Zoo-tiniali work has started. Let me show you the photos, wait 


All these erection work had started on quite 4-5 days back. But couldn't write any blogs due to not having any clear-cut decision. But right now I am fine. I will maintain my work. 

And also one more thing, these days labor's were also not available. Only one or two labor's remain at the site to do the work. So there's a issue in that also. But today new team is being invited. Waiting for them to come to do the work. Hope that they would do the work properly by bringing about 5-6 labor's. None of the work should remain balance. Every work should be done properly and on time. 

So the new team has arrived. And they are carrying the work as advised to them. 



They have better skills and also take better precautions for their safety. They know how to acknowledge their work of their own. Anyway indeed a great pleasure😌. 

So to do the panel erection work, now the work is on progress and also have to do the work faster. Day and night, the work will be going on from now onwards. The labor's are busy at their work and also the supervisor's are also carrying their work forward. 


The panel work can't be stop from day to day working hours. As the work needs faster to do so. So we all are busy and ready to do the work faster. So that we can open the traffic to public. Otherwise there's lot of traffic congestion going on now. 

The work of RE Wall is going on now and also the bridge work also. Many girders were lifted and also slab casting is also being going on. Hoping that bridge work will be completed fully in next year i.e., 2024. 

Remember one thing that the pcc work should be done at the bottom of the panels. This is done so that after aligning the panel doesn't fall backwards. Neither it gets a single move in backward direction. 


As you can see in the images that at the bottom of the panels PCC casting work has been done. And why this is done I have explained above. But anyway remember the steps. 

And after doing all these work you can do the sand filling and put the Geogrid in the cavity of the panels. And like this the step-by-step work goes on. 

All these are for today's article 📰 about the Zoo-tiniali work. And if you want to know, the details of how these works are done, then you can visit these websites. Click on the links below 

Reinforced Earth Wall 

Excavation of RE Wall 

Machineries used in RE Wall

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient for the work. 

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks mo

Machineries used in RE Wall

 So far you all have known that, how RE Wall construction is done and how they are installed. You might have known from the previous blogs. The panels, how are they casted and how the erection work is done. If you have not seen my previous blogs then you will understand nothing. First go and understand these articles by clicking on the link and then only you will understand here briefly.  So, the type of machineries used in RE Walls are as follows :-  Hydra  Dumper  Grader  Roller  Falkland  JCB  Vibrator  HYDRA  Hydra is the most important machinery used in RE Wall. Without hydra, nothing work is possible to do. Because to lift the panels, you will need crane or hydra. After casting for demolding the panels, you will need hydra only and also for panel erection, hydra is only the main aim to lift the panels. So HYDRA is the heart of RE Wall. Without this machine you will have to wait for somedays for work.  DUMPER  Dumper is used for transportation, to bring the soil. aggregates etc. f