Zoo-tiniali Flyover work

The erection of Zoo-tiniali work has started. Let me show you the photos, wait 


All these erection work had started on quite 4-5 days back. But couldn't write any blogs due to not having any clear-cut decision. But right now I am fine. I will maintain my work. 

And also one more thing, these days labor's were also not available. Only one or two labor's remain at the site to do the work. So there's a issue in that also. But today new team is being invited. Waiting for them to come to do the work. Hope that they would do the work properly by bringing about 5-6 labor's. None of the work should remain balance. Every work should be done properly and on time. 

So the new team has arrived. And they are carrying the work as advised to them. 



They have better skills and also take better precautions for their safety. They know how to acknowledge their work of their own. Anyway indeed a great pleasure😌. 

So to do the panel erection work, now the work is on progress and also have to do the work faster. Day and night, the work will be going on from now onwards. The labor's are busy at their work and also the supervisor's are also carrying their work forward. 


The panel work can't be stop from day to day working hours. As the work needs faster to do so. So we all are busy and ready to do the work faster. So that we can open the traffic to public. Otherwise there's lot of traffic congestion going on now. 

The work of RE Wall is going on now and also the bridge work also. Many girders were lifted and also slab casting is also being going on. Hoping that bridge work will be completed fully in next year i.e., 2024. 

Remember one thing that the pcc work should be done at the bottom of the panels. This is done so that after aligning the panel doesn't fall backwards. Neither it gets a single move in backward direction. 


As you can see in the images that at the bottom of the panels PCC casting work has been done. And why this is done I have explained above. But anyway remember the steps. 

And after doing all these work you can do the sand filling and put the Geogrid in the cavity of the panels. And like this the step-by-step work goes on. 

All these are for today's article 📰 about the Zoo-tiniali work. And if you want to know, the details of how these works are done, then you can visit these websites. Click on the links below 

Reinforced Earth Wall 

Excavation of RE Wall 

Machineries used in RE Wall

Comments

Popular posts from this blog

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

Importing AutoCAD into Revit

So today in this blog I am going to explain how I made an AutoCAD 2D plan and then imported it into Revit software. So you read this blog from starting to end, then only you'll understand clearly.  This is all basic and not any crisscross idea or ruthless situation. It's very simple. First you do all the basic steps in AutoCAD, and you know what is that. Going to Format, set up the units and bla, bla, bla. After that making all these set-up you start with the drawing plan. You yourself have created a idea "how my drawing plan will look like" or "how will I make it?" But before going into complex, first you make a simple drawing plan, like this    First you make the lines and after that create the room size and area of your own. You are exclusively expert in that. This is the first and foremost drawing plan you have to make. And the rest you know how to make it. All boundary lines, room shape and size, passage, staircase etc. you know it very well.  Now you g...