Site-Clearance in Construction Site

 In every site you see, there is no clearance of anything. Whether you clear the jungle or you clear the grass-bush area. Then also after clearing all these, there will be some things remaining in the site. Such as barricades or un-uniform distribution of soil. 



As you can see in the images that there is no even distribution of soil neither barricades were properly arranged. All these problems come to arises, while working on the site. These specifications must be considered with clear decision. But the thing is not that you shouldn't have to clear it. You have to clear it but with specific reasons and time. 



To make it clear, you have to put some sign boards at the front of the barricades. So that they can be aware of it (the public). After that you start the work of clearing your site. Whatever the machines or equipments you have, you can clear with that. So be cautious and do the work perfectly. 

You can now start the work and remove all the unwanted materials from the site. If you see something is not clear or even barricades were not properly distributed, then clear 🆑 that things also. Because for safety first of all site clearance is important. After that it comes about safety boots, helmet, belt etc. Anyway come to the topic that we are discussing about. So make the site clearance first. 



Now you can go for work, and start to do whatever you need to execute it at your site. By clearing all those thing you can follow the steps-by-steps guide to maintain your work. 

  • By clearing the ground you can start the foundation work. 
  • Because after excavation your site becomes unclear again. So you can remove all the unwanted mud, or clay from the site. 
  • Keep the shutterings at free side, so that it becomes easy to work and also free to stag. 
  • After completion the foundation work don't just let it to stay it like that. Do the backfill immediately. 
Then only you will see some about 50℅ clearance of the site. And you are also free 🆓 to do the work. But all these problems arises at the site and you should have to be smart enough to tackle the problem out. 

Now, there is also one more thing I should have to tell you 🙂. You can use some heavy machinery or equipment, such as hydra or JCB to remove staging or heavy load. But these are used in big or large construction sites. So I have not told you before. To remove any heavy load or large boulders you use these type of machines. 

Last but not the least, you have to maintain the base clear and proper. Make sure that if the client or the boss of your company comes, doesn't finds any mis-match. Clear the site and maintain the work disciplinary. 

Comments

Popular posts from this blog

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

How to make Staircase in Etabs

 In the last blog I had described about making beams, columns, slabs/roofs in Etabs. But I forgot to tell you how to make staircase. Apology for that. But today in this blog I am going to discuss how to make staircase in Etabs. So before making Staircase first of all delete one side of the slab by single click. But remember one thing in the story side you should have to click "All Stories" so that automatically all slabs will get deleted and required gap and positioning will be appeared.  First click on All Stories After that select one portion of slab   After that go to Edit menu and click on Delete   Then one part of the slab of each story becomes hollow So doing the following steps you can now make the staircase. As for staircase we need hollow section at the top of it, so that it's free to move. In practical field also you can't provide staircase if the roof is covered with slab. Now the main procedure begins for Etabs.  Go to define tab menu and click on Se...

WHAT IS PEDESTAL IN FOOTING ?

 During foundation you should always be careful that there is no water present in the excavation pit and the depth should be accurate. So for that you need manwork and labourers to maintain it's accuracy. So before going further for any work just be careful that the depth of foundation is accurate and no error should be made. Because the structure of a building is fully depend upon foundation. And this is general sense that the all the building loads are carried to the foundation i.e., footing.  Before doing any foundation work first of all brick soiling is to be done or sand filling. The building where high rise structures are made, sand filling is done; but the house with ground floor, brick soiling is sufficient. But from where you will get the bricks. Obviously you will have to order or bring it from bricks factory where bricks are made. And after bringing the bricks where you will placed them?  (Actually all these practical knowledge are not taught in the college so ...