REQUIRED MATERIALS FOR STRUCTURAL WORK

 The structural materials here I am going to discuss is all about concrete works. Actually the work which is done before plastering and painting or before modifying. All structural works consists of two IS Codes i.e., IS 456:2000 & IS 800:2007. Because in their the structural works of each and every element is given in details. 

IS 456:2000

IS 800:2007

So you have deeply understood about the structural work that I am going to discuss about. Well for building the structural materials are footing, column, beam, slab, staircase, chajja etc. For bridge pile, pile cap, pier, pier cap, wing wall, abutment, girder, deck etc. and etc. For road we have sub-grade, sub-base course, base course, surface course etc. As well as for tunnel also, canal, dam, embankment and airport and railways also. But not us let talk much because the codes which I have given above are mostly used for building works and bridge works. 

So let us discuss about the materials required for making these structural works. The most common materials are cement, fine aggregates, coarse aggregates, steel, binding wires etc. Definitely you will asked a question who dosen't know as all these things are taught in colleges. But do you know what are the equipments or tools needed for these works? Or what are the machineries needed for these works? 




All these things might seem quite complicated for you as a fresher. But if you are an experience enough you are quite familiar with these terms. But for fresher once you visit at the site you will get to know each and every work you see on the site. Because the most common equipments you will get to see in every sites are spade, hook, cutting machine, blades, grinding machine and the most common tool is measuring tape. This measuring tape is must for every site engineers. The machines which required are concrete mixer for concrete mixing, water pump generator for dewatering, transit mixer for high grade concrete, concrete pump for pouring the concrete, vibrator for compacting the concrete etc. and many other machineries as well as JCB (Backhoe) is also needed. Where in some construction sites crane is needed for lifting heavy loads. 

The things which you get to study in your college is all about calculation of that structures. It's live load, dead load, earthquake load, wind load etc. so that the structure may not fail. But the things that you get to learn in the practical site is all done by machineries and cannot even imagine what types of loads are applied and how the workers are doing their work. The most basic software to learn all these are staad pro and etabs. 

To do all these structural works you should have to be experienced enough and high skilled caliber. You should have the ability and manpower to control all the statutory work. No one will guide you how to do the work but everyone will misbehave with you for faulty works. So you should be highly skilled enough to do about all kinds of work. 

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient for the work. 

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks mo

Machineries used in RE Wall

 So far you all have known that, how RE Wall construction is done and how they are installed. You might have known from the previous blogs. The panels, how are they casted and how the erection work is done. If you have not seen my previous blogs then you will understand nothing. First go and understand these articles by clicking on the link and then only you will understand here briefly.  So, the type of machineries used in RE Walls are as follows :-  Hydra  Dumper  Grader  Roller  Falkland  JCB  Vibrator  HYDRA  Hydra is the most important machinery used in RE Wall. Without hydra, nothing work is possible to do. Because to lift the panels, you will need crane or hydra. After casting for demolding the panels, you will need hydra only and also for panel erection, hydra is only the main aim to lift the panels. So HYDRA is the heart of RE Wall. Without this machine you will have to wait for somedays for work.  DUMPER  Dumper is used for transportation, to bring the soil. aggregates etc. f