PROJECT PLANNING AND DEVELOPMENT

 To build any city, infrastructure, road-planning and development of industrial areas project is planned and after that the work is started. Without planning no project can be done and no plan can be issued. So before doing any work in any company planning is made first and after that the project is made. Always remember that every work has some instance and forbidden. But never be happy for instance work and never be sad for forbidden work.


Now, the most important thing is what you will do before doing any project or before planning any project? Do not panic. As the senior advice you just follow the steps and you will definitely able to create a wonderful project. Because the planning is done in AutoCAD but before planning the soil is tested and the area is surveyed as to find the right and actual position of the project. Step-by-step every work is done and in survey every point is taken. 


In today's world every system is build on planning and technology. Without technology no development can be made fast and efficient. For every part of work machinery tools are used. There are lots of digital meters used now-a-days. Basically for a scientific and high technology project these digital equipments are used. 

Many project planning are made by municipality or Panchayat & Rural Development members. These are some of the kinds of projects that are made for building residential areas or commercial areas respectively. And in all these projects all Civil Engineers are used to bring it into high complexity design. So to make  development in any building or planning a city Civil Engineers recruitment are required. So being a passed-out student or fresher you don't think that there is no job for you. There is job, but the thing is that you should have experience in any civil work. 

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks...