We all know that finishing work of house includes painting, tiles fitting and plumbing works as well as electrical works. All these works are done after completing the plastering works of the house. So in order to make proper and dominant work you should have to spend some time with the workers so they don't waste the required materials uselessly. There are also other works such as false ceiling work, wallpaper work, spraying and design aesthetic appearance etc. are also some works that are done at the end. Fitting up of furniture's, glass and woodworks will be discussed later. But here we will discuss about painting, flooring and plumbing works which can be done in a week.
For flooring work the required materials are tiles, white putty, cement etc. But be careful with the required number of materials. Because there are also some wastage that are to be handled out. Otherwise every materials brought on the site are never satisfied with the workers. So if you want to fit tiles in the house be careful with the Mistry and workers and tell them to make a proper list of the materials that are to be needed while doing the work.
Similarly the same is to be done with the plumbing works as well as the electrical works. Otherwise there will be a lot of money waste and as a result the work will take much more time to complete it. Because the materials required with all these works are not to be satisfied with you.
Well I have not said about the materials required for plumbing and electrical works because there are lots of materials needed. Out of the common materials needed are pipe, elbow, T-joint, socket, basin, tape etc. and electric wires, casing, electric board etc. are required respectively. And not only these there are also some other materials needed which are not exactly in my mind. 😄😄😄😄
Comments
Post a Comment
Please do not enter any spam comment.