FINISHING WORKS OF HOUSE

 We all know that finishing work of house includes painting, tiles fitting and plumbing works as well as electrical works. All these works are done after completing the plastering works of the house. So in order to make proper and dominant work you should have to spend some time with the workers so they don't waste the required materials uselessly. There are also other works such as false ceiling work, wallpaper work, spraying and design aesthetic appearance etc. are also some works that are done at the end. Fitting up of furniture's, glass and woodworks will be discussed later. But here we will discuss about painting, flooring and plumbing works which can be done in a week. 


For painting works the required materials are brush, shoe-brush, thinner, primer and color paint. Because after completing the plastering work and giving it to dry for one month the main work done is painting. After that the wall gives a shiny and colorful appearance which looks aesthetically beautiful.


For flooring work the required materials are tiles, white putty, cement etc. But be careful with the required number of materials. Because there are also some wastage that are to be handled out. Otherwise every materials brought on the site are never satisfied with the workers. So if you want to fit tiles in the house be careful with the Mistry and workers and tell them to make a proper list of the materials that are to be needed while doing the work. 

Similarly the same is to be done with the plumbing works as well as the electrical works. Otherwise there will be a lot of money waste and as a result the work will take much more time to complete it. Because the materials required with all these works are not to be satisfied with you. 




Well I have not said about the materials required for plumbing and electrical works because there are lots of materials needed. Out of the common materials needed are pipe, elbow, T-joint, socket, basin, tape etc. and electric wires, casing, electric board etc. are required respectively. And not only these there are also some other materials needed which are not exactly in my mind. 😄😄😄😄

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks...