CONSTRUCTION MANAGEMENT

 First of all I would like to ask you what is management? Because before discussing about construction management first of all you should have to be careful with the term management. Obviously management means planning, decision making, leadership process, co-operating with the works of others etc. and etc. And most importantly he should be careful about the company to handle the problems of his work. 

Construction management is also same thing that involves in . The manager should be careful about the materials, equipment's and machineries that are required in the construction site. He should also have the power to handle every labor problems and the working area of the site. He should have to think 360° view of the work in the construction site, where the obstructions will occur, how to control the execution of work and how to make the work efficient and easy.

But this construction management cannot be achieved within a short period of time, because you should have the experience of construction work. You should have the experience of each and every construction work and this could achieved after 10 to 15 years when you are fully confident about each and every construction work in the company.

There are some major cases that you should have to be careful about such as providing them safety equipments, handling the work in each and every difficulty, managing the workers etc. As the same work is done by the contract engineer like that the same work is also provided by the construction manager also. But every work is not done by the manager like the same way every work is not done by the contract engineer. Because the contract should have to view and think about the work that is to be done at the site. But the construction manager have to handle and qualify the workers about the work to provide them every benefits. 

Okk with this case everything is okk. Then what does the contractor do? Because mostly as a fresher you see that all these safety equipment's, materials and tools are provided by the contractors. Well in small projects it happens but where their is a large project of about more than 100 crores the contractor only pays and discuss about each and every materials, machineries how to keep them at the site and how to work with them. But in most cases the contractor only pays to the workers and machineries that are bought by him. No matter from where he gets that money; because for every new equipment's or materials he gets paid by the company. 

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks...