CEMENT BAG

 Well every Civil Engineer must know about the quality of cement used on the site. There are some laboratory test and as well as there are some field test also. But how you will check the cement on the site without any apparatus😨? Well that's really sort kind of thing. First of all, after opening the cement bag see that there are not any lumps occurring in the cement bag. Take some little amount of cement on your hand and see that no mould like shape appears on it. It should be smooth and free falling

Now let us come to the main point. In some cases there may be a problem you can face on the site that less cement bags are available according to the need of yours. So what you will do on that day. You cannot stop the work otherwise there will be no salary for you as a fresher. You should have to come each and every day to up-grow your career as a Civil Engineer. So look for other sort of works where less cement bags are needed or do woodwork such as shuttering work, framework etc. Otherwise there will be no work for you to do or you should have to stop the work on the site which will be a huge loss to the company. So don't panic because of less cement bags in the site, do some other shortage of work where you can regenerate it. Because it will take more than 3 to 4 days for bringing other bags of cement in the site. 

Let me clarify you with a simple example. See in my case, the site where I am working at has only 18 bags of cement left on it, but the required no bags need for casting is 22bags for two footing. But if I think of using all those 18 bags for two RCC footings then there will be no cement bags left over for next day to work in the site. So with all those tensions and difficulties, there are only six foundations left for PCC shuttering and concreting, and we went through with that work because less number of cement bags are required for those kind of works. Therefore , continuously for three days we made all those foundations cleared with PCC and the remaining RCC work will be done till the next cement bags appears on the site. So like that you will have to utilise your brain and keep the work continuous to go on so that not a single day you should remain unwork. 

But wait, the topic is soon not yet over. What you will do with the old cement when new cement appears on the site after few days. The step is just simple. Just bring the old cement bags at side apart and enter the new cement bags inside it. Because keeping the new cement bags with the one's will damage and will be of no use. It's like keeping the rotten apple with the good one's. So as a Site Engineer or Site Supervisor be careful with all those things. 

Comments

Popular posts from this blog

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

How to make Staircase in Etabs

 In the last blog I had described about making beams, columns, slabs/roofs in Etabs. But I forgot to tell you how to make staircase. Apology for that. But today in this blog I am going to discuss how to make staircase in Etabs. So before making Staircase first of all delete one side of the slab by single click. But remember one thing in the story side you should have to click "All Stories" so that automatically all slabs will get deleted and required gap and positioning will be appeared.  First click on All Stories After that select one portion of slab   After that go to Edit menu and click on Delete   Then one part of the slab of each story becomes hollow So doing the following steps you can now make the staircase. As for staircase we need hollow section at the top of it, so that it's free to move. In practical field also you can't provide staircase if the roof is covered with slab. Now the main procedure begins for Etabs.  Go to define tab menu and click on Se...

PROJECT PLANNING AND DEVELOPMENT

 To build any city, infrastructure, road-planning and development of industrial areas project is planned and after that the work is started. Without planning no project can be done and no plan can be issued . So before doing any work in any company planning is made first and after that the project is made. Always remember that every work has some instance and forbidden. But never be happy for instance work and never be sad for forbidden work. Now, the most important thing is what you will do before doing any project or before planning any project? Do not panic. As the senior advice you just follow the steps and you will definitely able to create a wonderful project. Because the planning is done in AutoCAD but before planning the soil is tested and the area is surveyed as to find the right and actual position of the project. Step-by-step every work is done and in survey every point is taken.  In today's world every system is build on planning and technology. Without technology...