EXCAVATION OF SOIL FOR FOUNDATION

 Many of us has already learned in our college days that before doing any foundation work excavation is must. In technical term it is also called as earth cutting. But how to do excavation or what to do before excavation, does you know that. Well as a fresher you may be aware of these things. But if you are experienced one you know about it. But then also there little difference left about it. Well let's discuss about that. 

As per the drawing reading, the layout plan of foundation should be taken more than the given drawing. If in drawing it is given 2400 x 1800 then for marking you should have to take 2600 x 2000. Because after excavation you should have to place the shuttering for concreting for the footing. But then also the gap you placed is not enough because after excavation by JCB there are lots of error which you cannot identify it but can determine it. And also excavation by JCB is not accurate but it takes less time than manwork. 

After excavation by JCB, the manwork is done for it accurate shape and size and most importantly to find out the center of the footing. When all these things are done and the base of the footing is perfectly levelled then the brick soiling or sand filling is done. If the building is of ground floor then brick soiling is okk but if it is of G+4 or G+5 then sand filling is must. Because as a Civil Engineer you all know that bearing capacity of sandy soil is more then that of clay soil. 

After brick soiling or sand filling PCC is done of ratio 1:3:6. This PCC makes the base of the foundation strong and above which the RCC work can be done. But the RCC work is done the very next day because if the excavation pit rises water above the PCC level then it becomes very difficult for the workers to work at the site. So the RCC work is done the next day and it becomes smooth and efficient for the workers to work at it. And remember one thing there should be maximum 50mm gaping before placing any footing work. The best idea is to use the cover block of 50mm. 

After that foundation the column head is done which is above the footing. We also called it as pedestal column. This varies with size and height. After all these work the back filling is done. And at last the foundation work is over.

Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient ...

How to edit grid systems in Etabs

 Okk in the last blog I had discussed about Etabs for beginners. You have got at least some ideas about it. If you have not seen it then click here . But here I am going to discuss how you will edit Grids/Columns in Etabs. As I had said by clicking on "Modify/Show Grid Systems" option a new dialog box appears, their you can edit anything. But you can also do it by different way. On the left side in grid dimensions (plan) you can see that two options are available. One is "Uniform Grid Spacing" and the other is "Custom Grid Spacing". Click on the "Custom Grid Spacing" and you see that Edit Grid Data option is available. Just click on that, and you can edit it as you want by giving the required dimensions in X-axis and Y-axis only. Ok whatever be lets come to the topic. If you have done it like as I have shown earlier then follow those steps. And the one who were new to this blog this is just for that. That's why I underlined with BLUE line an...

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks...