EARTH CUTTING, BRICK SOILING, PCC SHOULD BE MADE IN A DAY

 There are many reasons and many might may think why Earth cutting, Brick soiling and PCC should be made in a day. Well the thing is that if this thing is not done today then the contractor charge may increase the next day for the labourers. 

In many cases and many sites you may see, after doing excavation the water table rises up from the underground water and day by day it increases. And it is not possible to do any foundation work in this condition. So the water is first cleared out from the excavation pit and then it is seen that the base of the excavation is of uniform shape or not. If it is uniform then the center point is marked with the help of rod or stick above the excavation pit, and if it is not then first the ground is made uniform and cut it along the edges of the footing and after that that the center point is marked. 

After marking the center point on the excavation pit it is again measured with the tape in all four sides whether accurate measure is taken or not as per drawing. if the measurement is accurate then the only the brick soiling or sand filling is done. After brick soiling then the bottom formwork is made for PCC. The mixture is made in concrete machine and after that it is brought to the excavation site for PCC work. If it is not done on this day the next day it becomes difficult for the workers, as taking out water repeatedly from the ground is not an easy task. It is a waste of time and lack of work to upgrade it. So the after earth cutting the Brick soiling and PCC work should be done in a day. 
Here you can see that the water level rises up after doing brick soiling also.



Wait, but there are some sites where earth cutting, sand filling, and PCC is done in different days. Definitely the sites where excavation pit has less water in it then it done in different days, but where the water table is high or it rises above to the ground surface then all three works should be done in a day. Otherwise the task becomes repeated. 


The RCC Footing which is done before but the water table rises up. 

On the very next day the RCC foundation is done. Otherwise if the water table rises up from the ground then it becomes difficult for the mistry to work on it. So the RCC foundation is done on the very next and after that again the next day the column head is done and repeatedly the process goes on for others foundation also. As the column head is finished the back filling work is done after that to make it free from rubbish and unwanted materials and as well as for the water level to remain inside the foundation. 



Comments

Popular posts from this blog

MACHINES USED AT CONSTRUCTION SITES

 The most commonly used machine at any construction site is JCB where it's technical name is Backhoe. It is the most common and widely used machine in any construction project whether its big or small project. It becomes easier and makes the work faster for the companies at any time of interval.    All other machines such as Transit Mixer, Concrete Mixer, Roller etc are also used in any kind of road project or building project. Transit Mixer is used for large large building projects, bridge projects, some kind of road projects etc. whereas concrete mixer is for small building projects. Roller is used for road project and bridge project for its elevation.  For any building project the most commonly used machines are concrete mixer, transit mixer, concrete pump, bar bending machine, needle vibrator, water pump and many more. All these machinery works make the work easier and faster. Otherwise if the work is done with labourers it will take more time and less efficient for the work. 

Excavation for RE Wall.

 So, hey guys! How are you? You might have read my previous blogs about panel casting  and panel placing . Now it's time to learn about panel erection or what to do after 3-4 months of casting the panels. So the first step is about excavation for RE Wall. Then only you can erect the panels. So let us learn about this excavation part.  You all know excavation work is done by JCB or Falkland. To excavate the soil and then carry it to the other dumped areas. But before excavation you all know, to marked the center line as well as the outer line also so that the area doesn't excavate much as per the requirement. For excavation just you need to take 500mm more, then that of the given drawing.  Doing this excavation is easy. But what to do if it's flooded with rain water/ or water coming from other sources. Definitely your answer will be to do dewatering work with a water pump. That's fine. But do this dewatering work with almost by fixing 3-4 water pumps. So that it soaks mo

Machineries used in RE Wall

 So far you all have known that, how RE Wall construction is done and how they are installed. You might have known from the previous blogs. The panels, how are they casted and how the erection work is done. If you have not seen my previous blogs then you will understand nothing. First go and understand these articles by clicking on the link and then only you will understand here briefly.  So, the type of machineries used in RE Walls are as follows :-  Hydra  Dumper  Grader  Roller  Falkland  JCB  Vibrator  HYDRA  Hydra is the most important machinery used in RE Wall. Without hydra, nothing work is possible to do. Because to lift the panels, you will need crane or hydra. After casting for demolding the panels, you will need hydra only and also for panel erection, hydra is only the main aim to lift the panels. So HYDRA is the heart of RE Wall. Without this machine you will have to wait for somedays for work.  DUMPER  Dumper is used for transportation, to bring the soil. aggregates etc. f