Making the Levelling Pad on Excavation pit.

 There are several ways to make levelling pad, for any RE Wall on the excavation pit. You can make a curved levelling pad, straight levelling, one step up-&-one step down etc. But in my case the curve levelling pad is followed, as the RE Wall structure will be in curve position 😂.  And so levelling pad is also made like this, as per the drawing.  Levelling pad is made curved. This is the image of backfill after making the levelling pad.  So levelling pad is made like this. Now the steps to follow to make a levelling pad are as follows :  First you do excavation. And for doing excavation you can read this article.  All steps and process were described briefly. You can do excavation either by JCB or with Falkland also. Since the excavation is large and long, you cannot do by hand-made labors. It will take more time and as well as more economy will also be lose. So to do these type of excavation machinery equipment is used.  After making excavation, ...

Design you can make in 3DS Max.

 Multiple numbers of designs you can make in 3DS Max. Multiple numbers of designs are available. Interior room design, Exterior design, Office room design, Bedroom design, Living room design etc. and also for furniture's design you can make in 3DS Max. Not only these, many more designs you can make, but to tell it more time will go and will become more complicated. All these types of designs can be make by practicing and practicing more & more.  I have also made various types of designs, such as office room, bedroom, house design interior, house design exterior, also with the modifier tools, such as, sofa design, wall designs, railing designs, column design and many more. It will be going on telling and telling, but nothing could be understand. There's a one type of design, which I have completed in 2 weeks.    It's a office room design and it seems to be simple. But to make this this design it took me so many days. Just to identify it or think it, seems to be si...

Dewatering from excavation pit.

  What to do if the excavation pit is waterlogged? Or what are the procedures you have to follow for dewatering the excavation pit? All these things seem to be minor, but actually not so. You have to take a long step to do it, and also have high thinking. You already know, how waterlogging occurs. Due to heavy rainfall or continuous rainfall, the area gets flooded and thus waterlogging occurs. But what happens, if your construction site or the excavation you have done for  RE Wall gets waterlogged? So there are various steps you should have to do as follows:  First of all, you cannot do dewatering directly if you see the water level rising up to the ground surface. You have to wait for some days for the sun to appear and to evaporate it. After that you can bring the water pump to dewater the excavation pit. Since the Sun cannot evaporate all the flooded water at once. It will need days to evaporate it or even a week.  And if the sun appears one-or-two days and again...