Skip to main content

Posts

Showing posts from February, 2023

Zoo-tiniali Flyover work

The erection of Zoo-tiniali work has started. Let me show you the photos, wait  All these erection work had started on quite 4-5 days back. But couldn't write any blogs due to not having any clear-cut decision. But right now I am fine. I will maintain my work.  And also one more thing, these days labor's were also not available. Only one or two labor's remain at the site to do the work. So there's a issue in that also. But today new team is being invited. Waiting for them to come to do the work. Hope that they would do the work properly by bringing about 5-6 labor's. None of the work should remain balance. Every work should be done properly and on time.  So the new team has arrived. And they are carrying the work as advised to them.  They have better skills and also take better precautions for their safety. They know how to acknowledge their work of their own. Anyway indeed a great pleasure😌.  So to do the panel erection work, now the work is on progress and also h

Site-Clearance in Construction Site

 In every site you see, there is no clearance of anything. Whether you clear the jungle or you clear the grass-bush area. Then also after clearing all these, there will be some things remaining in the site. Such as barricades or un-uniform distribution of soil.  As you can see in the images that there is no even distribution of soil neither barricades were properly arranged. All these problems come to arises, while working on the site. These specifications must be considered with clear decision. But the thing is not that you shouldn't have to clear it. You have to clear it but with specific reasons and time.  To make it clear, you have to put some sign boards at the front of the barricades. So that they can be aware of it (the public). After that you start the work of clearing your site. Whatever the machines or equipments you have, you can clear with that. So be cautious and do the work perfectly.  You can now start the work and remove all the unwanted materials from the site. If

Why Traffic Congestion occurs?

  You can see in the image of the traffic congestion, and why does this occurs just ask yourself.  The modern reason for traffic congestion I will explain below. But to remove this traffic congestion can include various points, such as :  Make the roadway little bit broader.   Remove the unwanted traffic that creating disaster.  Many vehicle's like as auto, magic or goods carrying vehicles stops ⛔ nearby and creates a havoc.  People should be aware to maintain their own traffic rules.  So, anyway lots and lots of points/ideas would come to your mind about these traffic congestion. So to remove this problem there should be construction of new roads, making the roadway broader or constructing a flyover just to pass over the railway crossing.  As you can now see in the images 🖼 that a flyover construction is going on so to reduce the traffic-jam. And just think about it how it would look like after it. It would be fantastic isn't it? It will also get to reduce the traffic congest

Zoo-Tiniali Flyover in Guwahati

Zoo-tiniali flyover construction had been started from February 2022. The work is going on fast and almost now half of the work is completed. And half is remaining to do in this year i. e., 2023. The engineer's, labor's, mistries supervisor's all of them are on their duty and they carry out their work regularly.  Half of the work is almost done, and now their is RE-Wall construction work which will also be carried on. Excavation work is going on now, along Hatigarh side. The work is in progress now. In the meantime they carry on their work for girders. Steel girders are being used their, so to maintain the stability of the road.  But anyhow, the construction of flyover is going on tremendously. No obstruction, no idleness, no work hectic situation. All works are being carried forwardly and none of them are creating any nuisance.  The flyover will be made in T-shape. So for the junction two columns are being made for the movement of traffic.  The bridge has been completed to

SEISMIC PROVISIONS AND RETROFITTING

 SEISMIC EVALUATION OF BUILDINGS  Seismic evaluation is a process of assessing the seismic resistance of a building. This evaluation is necessary for determining or planning the retrofitting scheme or techniques required for making the structure seismically safe. The estimation for seismic resistance of a building i.e., in terms of its strength and ductility is not a simple task and require a lot of effort and studies on the part of structural engineer. The methodology available so far are based on the studies and examination of various parameters of the building, which are explained below :-  Architectural and structural drawing of the building.  Specification of materials, soil testing reports etc.  Past performance of similar type of buildings during the earthquake.  Comprehensive examination/testing of load bearing members of the building.  Visual inspection of the building which should include all types of weakness/deficiencies present in the building.  The aim of these studies is

Project Work and its Presentation

 Educational technologies in many foreign countries has given importance to individual project work right from the primary education. Such project work is found to be essential for involvement of the learner's in education. However, the students are very curious about many areas related to their subjects and profession, areas such as different materials, work done by different professionals etc.  Project Work  1. Study of different maps - Collect maps of different towns in India - Delhi, Bhopal, Chandigarh, Chennai, Ahmedabad, Hyderabad, Pune, Bangalore, Calcutta, Jaipur, Mumbai etc. Display maps in the classroom/drawing hall to study details shown in the maps and street patterns.  Collect information about transportation systems, water, drainage, electrical services, slum problems and proposals for improvement in the total environment. Classify them and then think of requirements for  (a) towns near rivers  (b) towns near sea shores  (c) towns with religious festivals  (d) towns f

Tunneling in Rocks

 Tunneling in the rocks is very difficult and tedious work. Nowadays tunneling in rocks is done with the mechanical methods only, because tunneling by manual labour is not done these days, as it was done during ancient times.  Methods of tunnel construction in hard rocks differ from tunneling in soft grounds. Tunneling in rocks is much costlier than tunneling in soft ground. As rocks are self supporting, they require less supporting. As slight deviation will involve huge wastage of money, greater care is required in tunneling through rocks. In rocks the tunneling work can be started in various sections for expecting the work.  SEQUENCE OF OPERATIONS  All the operations in tunnel construction must be done in proper sequence and in well-planned manner. The sequence of various operations mainly depends on the type and size of tunnel, method of blasting, type of formation encountered etc.  After locating the center-line, generally the work of tunneling is done in the following sequence:  C